-
he called it, documenting the fact that Yale
-
had deferred maintenance in the buildings,
-
he called it, and a study that he
-
commissioned, a very good study that he commissioned, argued that the deferred
-
maintenance-- Yale could be brought up to
-
snuff and then go on afterwards as a normal running institution
-
provided it spent 100 million dollars a year for ten years,
-
and that included fixing every college--
-
they're going to do more than one a year over a 10 year period.
-
So Yale's total budget, as I told you,
-
was about 1 billion dollars at the time,
-
and then here all of a sudden was this 100 million dollar a